Project Description
The boiler rooms, heat ducts and infrastructure in Istanbul Technical University (ITU) Florya campus and road lighting (1 km) works in Ayazaga Campus had been completed in 3 months.
The old, rusted heating and water pipelines, old equipment and machinery had been replaced with new ones and all of the system had been converted suitable to natural gas.
In Ayazaga Campus, a road segment of 1 km without lighting had been installed with lighting fixtures.
The work had started on September 16th 2008 and completed on December 17th, 2008.