Project Description
The 12 units of residence buildings had been damaged at the earthquake of 1999 Kocaeli, and decided to be demolished by the the 52nd Armored Division.
All of the material had been dismantled and returned to the employer and then the building had been demolished. All of the job, including the leveling of the ground had started on November 1st 2003 and finished in 28 days.
The demolished construction area is 18.500 m2.